Home / Maaden Gold mine at Bulghah installation and civil work with Aggreko 5MW
Maaden Gold mine at Bulghah installation and civil work with Aggreko 5MW Maaden Gold mine at Bulghah installation and civil work with Aggreko 5MW

Maaden Gold mine at Bulghah installation and civil work with Aggreko 5MW

2018
  • Control Panels Fabrication and Installation
  • ATS Panels Fabrication and Installation
  • Synchronization Panels Fabrication and Installation
  • Distribution Panels Fabrication and Installation
  • Bus Bars Junction Box Fabrication and Installation
  • Transformer Testing and Installations
  • Switch Gear Testing and Installations
  • Sub Station Installations
  • HV & LV Cable Terminations
  • Maggering & Hi-Pot Testing
  • Line Stringing (LV&HV)
  • Feeder Pillars Installation
  • Bus Bars Installation & Maintenance
  • Installation & Repair / Maintenance of Electrical panels & Control Systems.
  • Cable Management Solutions
  • Periodic Tests & Inspections
  • Design & Installation Services
  • Lighting Installations
  • Structured Wiring Systems
  • Data Networking
  • Access Control
  • CCTV Systems
  • Emergency Lighting
  • Fire Alarm & Control Systems
Go Back Top